Every sprinkler, alarm, and suppression job starts with a permit. This feed surfaces new fire-system permits and inspection activity — address, contractor, valuation, status — daily, geocoded, before the market knows the work exists.
See every system going in, who's installing it, and at what valuation. Bid the inspection and service contract that follows.
Contractors on the feed are buying heads, panels, and pipe this month. Sequence outreach to permit issue dates.
Failed inspections are service calls waiting to be won. The feed flags status changes daily.
| FIELD | DETAIL |
|---|---|
| Source | Miami-Dade building permits (county GIS), fire-classified — statewide expansion in build |
| Coverage | Florida — Miami-Dade first |
| Cadence | Daily refresh, timestamped per record |
| Volume | 2,000+ records under management |
| Record | Permit number, address, lat/lng, contractor + license, valuation, type, description, status, issue date |
| Enrichment | Geocoded (WGS84), deduplicated, status change-tracked |
Metro, statewide, or national — per-feed subscription with the same record store underneath. Seats scale by tier; cancel anytime.